Independent · Free guides · Form data stays local
entrycardguide·
English

HM · Oceania

Heard Island and McDonald Islands

Partially verified · Research reviewed 2026-09-24

This destination has partial coverage. The procedures below have recorded supporting sources; other requirements remain unverified. Check the destination authority before traveling.

1 published procedures; 0 recorded procedures withheld; 1 open research questions.

At a glance

  1. Heard Island and McDonald Islands — entry permit required (EPMO 1987, AAD permits page) Travel authorization · Conditional · Not verified

Source-backed procedures

Travel authorization

Heard Island and McDonald Islands — entry permit required (EPMO 1987, AAD permits page)

Open the official page ↗https://www.antarctica.gov.au/antarctic-operations/stations-and-field-locations/heard-island/protection-and-management/permits/
Channel
Conditional
Fee
Not verified
Authority
Australian Antarctic Division (AAD), Department of Climate Change, Energy, the Environment and Water, Australia
Source verification date
2026-09-24

When to apply

Permit application at least 5 months in advance.

Who it applies to, exceptions and limits (full text)

Direction: any person or expedition seeking to access Heard Island and McDonald Islands (HIMI). Per the AAD permits page: the HIMI Environment Protection and Management Ordinance 1987 (EPMO) provides that a person may only enter the HIMI Territory (including the 12 nautical miles territorial sea) in accordance with a permit issued under the Ordinance, or during an emergency, or while performing duties as an inspector appointed under the EPMO. Per the AAD territory page: the Department of Climate Change, Energy, the Environment and Water is responsible for the administration of the HIMI Territory, and the Australian Antarctic Division fulfils this role for the Department. Applications must be submitted at least five months in advance. No ordinary traveller declaration entry was found on the AAD pages this round; recorded as unresolved.

Based on: HM-aad-permits · HM-aad-territory

Sources

  1. Permits — Heard Island protection and management · Australian Antarctic Division (AAD)
    https://www.antarctica.gov.au/antarctic-operations/stations-and-field-locations/heard-island/protection-and-management/permits/ [HM-aad-permits]
  2. The Territory of Heard Island and McDonald Islands · Australian Antarctic Division (AAD)
    https://www.antarctica.gov.au/about-antarctica/australia-in-antarctica/the-territory-of-heard-island-and-mcdonald-islands/ [HM-aad-territory]

← Global traveler library